Redeployment and Operation Floating LiDAR System To inform the engineering designs and...
Notice to Mariners
This page displays all BGW’s Notice to Mariners, current and historic
03/05/2022 – Redeployment of Floating LiDAR
Redeployment of the Floating LiDAR system following recovery in January 2022 was expected to take...
20/04/2022 – Redeployment of Floating LiDAR
The recovery of the capsized Floating LiDAR System (including the mooring and clump weight),...
20/01/2022 – Recovery of Moorings
Recovery of Moorings An attempt to recover two moorings, estimated to be located within the...
07/01/2022 – Retrieval of Floating LiDAR System
Retrieval of Floating LiDAR System The Floating LiDAR System, located within the proposed Valorous...
22/12/2021 – Floating LiDAR Location
Retrieval of Floating LiDAR System An attempt to recover the capsized Floating LiDAR System...
16/12/2021 – Floating LiDAR Recovery
Retrieval of Floating LiDAR System The Floating LiDAR System, located within the proposed Valorous...
03/12/2021 – Recovery of Moorings
An attempt to recover two moorings, estimated to be located within the approx. locations below,...
09/12/2021 – Floating LiDAR Lost Communication
Possible Retrieval and Redeployment of Floating LiDAR System Unfortunately, communication has been...
09/11/2021 – Deployment of Floating LiDAR
Deployment and Operation Floating LiDAR System To inform the engineering designs and Environmental...