Planned Activity

 

A geophysical survey is due to be undertaken of the proposed Erebus Floating Offshore Wind Farm (FLOW) project. The survey will involve the use of Multibeam Echosounder (MBES), Sidescan Sonar (SSS), Sub-Bottom profiler (SBP) and Magnetometer equipment, some of which will be towed sub-surface astern of the vessel.

The survey will cover the main offshore array areas, plus 1km buffer. The extent of the planned survey is shown in the attached figure. Coordinates of the offshore array (and buffer) are also provided below.

The work will be undertaken by one vessel, operated by the survey contractor, GEOxyz.